
Fire protection bandage S90
SKU 9041527-10
Original price
€715,77
-
Original price
€715,77
Original price
€715,77
-
Current price
Fire protection bandage S90, 10 m
Main features short:
Separation of cable bundles up to Ø 10 cm
Approval Z-19.15-1877
Application areas:
Walls made of masonry, concrete, aerated concrete, lightweight partition walls in post-and-beam design with steel substructure; Concrete, reinforced concrete or aerated concrete ceilings. . Bulkhead size / minimum component thickness: . Solid wall / light partition: 10 cm. Blanket: 15cm. Max. Ø of the cable bundles / empty tube bundles: 10 cm
Hints:
More information at www.bti.de/brandschutz
Characteristics:
Particularly suitable for sealing off cables in the same penetration with pipes
Separation of cable bundles up to Ø 10 cm
Isolation of empty pipes. 3 empty conduits can be fed through together per bundle. Flammable plastic armored tubes up to Ø D a 40 mm. Non-combustible armored steel tubes up to Ø D a 50 mm
Filling of the remaining opening with dimensionally stable, non-combustible building materials such as e.g. B. concrete, cement mortar, gypsum mortar. The same sealing material can be used as for sealing the pipe bulkheads. Optionally, the remaining gap up to a width of 30 mm can be filled with isowoll F90 putty
The general building inspectorate approval Z-19.15-1877 must be observed for the approval-compliant and safe execution
Main features short:
Separation of cable bundles up to Ø 10 cm
Approval Z-19.15-1877
Application areas:
Walls made of masonry, concrete, aerated concrete, lightweight partition walls in post-and-beam design with steel substructure; Concrete, reinforced concrete or aerated concrete ceilings. . Bulkhead size / minimum component thickness: . Solid wall / light partition: 10 cm. Blanket: 15cm. Max. Ø of the cable bundles / empty tube bundles: 10 cm
Hints:
More information at
Characteristics:
Particularly suitable for sealing off cables in the same penetration with pipes
Separation of cable bundles up to Ø 10 cm
Isolation of empty pipes. 3 empty conduits can be fed through together per bundle. Flammable plastic armored tubes up to Ø D a 40 mm. Non-combustible armored steel tubes up to Ø D a 50 mm
Filling of the remaining opening with dimensionally stable, non-combustible building materials such as e.g. B. concrete, cement mortar, gypsum mortar. The same sealing material can be used as for sealing the pipe bulkheads. Optionally, the remaining gap up to a width of 30 mm can be filled with isowoll F90 putty
The general building inspectorate approval Z-19.15-1877 must be observed for the approval-compliant and safe execution